A Bauer Grant was used to upgrade the Grave Barn parking and Seashore Construction of Madison was selected for the project. The north existing lot and the westside parking areas were first sub-graded and then topped with 3/4-inch Tilcon process stone which was machine spread and packed. Read more »
Our 300-Year-Old-Plus Chimney Gets New Caps
John Grave 2 lived in the original house in 1685. Around 1711 he added an addition with massive fireplaces built by slaves from Guilford. The caps were damaged and collapsed in the Summer of 2021.Thanks to a Bauer Grant, new one and one/half inch bluestone caps were fitted and secured. Read more »
Painting The Back Of The Deacon John Grave House Completed